Product detail , Please refer the video
Product Details
Place of Origin: | Guangdong, China (Mainland) | Brand Name: | Feleng |
Model Number: | KS-0425/0426 | Protection Level: | IP65-IP67 |
Type: | Extruded enclosure | External Size: | 169.5x67.2mm |
Dimensions: | W169.5*H67.2mm,the length is freely | Surface treatment: | Mill finish, anodizing, sandblasted, silk-screen printing etc. |
Material: | Aluminum Alloy | Certificate: | ISO9001:2008 |
Color: | Black, yellow, red, blue, silver | Application: | Inverter |
Customization: | Acceptable | Product Name | Inverter enclosure |
Packaging &Delivery
Packaging Details | Standard export carton | Delivery Time | Within 5-7 days |
Best-selling of PCB Mounting Enclosures drawing
The PCB Mounting Enclosures size only for width and height, because the length is variable. If the finished size cannot meet your needs, we have capable to customize for our buyers. please send me your drawing
Various surface treatments, for example, anodize, sandblast, drawing polishing, electroplating ,
laser of PCB Mounting Enclosures
Let's still introduce sandblast.
Matters needing attention
1. Wear protective equipment before work, and do not work with bare arms. No less than two persons shall be employed.
2. The gas tank, pressure gauge and safety valve shall be checked regularly. The gas tank releases dust once every two weeks, and the filter in the sand tank is checked once a month.
3. Check whether the ventilation pipe and sandblasting machine door are sealed. 5 minutes before work, the ventilation and dust removal equipment must be started. When the ventilation and dust removal equipment fails, the sandblasting machine shall not be allowed to work.
4. The compressed air valve shall be opened slowly, and the air pressure shall not exceed 0.8mpa.
5. The degree of sandblasting shall be consistent with the working requirements, generally between 10 and 20, and the sand shall be kept dry.
6. No irrelevant personnel are allowed to approach the sandblasting machine when it works. When cleaning and adjusting operating parts, stop the machine.
7. Do not use compressed air to dust or make jokes.
8. After the completion of work, the ventilation and dust removal equipment shall continue to operate for five minutes before closing, so as to expel indoor dust and keep the site clean.
9. In case of personal and equipment accidents, the site shall be maintained and reported to relevant departments.
Why choose us ?
More than 13 years’ production experience.
Advanced machining and test equipment.
Super design ability by creative design team.
Companies strictly enforce the ISO9001 system to ensure product quality.
Feneng earned 50 innovation awards.