Because we are in the process of production is generally static test, and the general test items can not be detected in this kind of defective products. Often is, in the factory test all qualified, but to the client explosion, overheating or customer design transformer output power is not up to. So how can we prevent this from happening?
2- strictly follow the customer acceptance letter and work instruction, and do not change the material without the customer's consent.
3- in case of similar defects, take the initiative to communicate with the customer engineering, adjust the ratio of primary winding number and increase the air gap depth of the magnetic core.